Private companies (PCs) in restructured electricity industries determine facility investment timing and sizing. Such decisions maximize the PC’s expected profit (rather than social welfare) under uncertainty. By anticipating the PC’s incentives, a welfare-maximizing transmission system operator (TSO) shapes the network to align public and private objectives. Via an option-based approach, we first quantify welfare losses from the PC’s and TSO’s conflicting objectives. We show that by anticipating the optimal timing and capacity decisions of the profit-maximizing PC, the TSO is able to reduce, though not eliminate, welfare loss. Next, we exploit the dependence of the PC’s capacity on the TSO’s infrastructure design to devise a proactive transmission-investment strategy. Hence, we mitigate welfare losses arising from misaligned incentives even in relatively uncertain markets.
AlkuperäiskieliEnglanti
Sivut1167-1188
Sivumäärä22
JulkaisuEuropean Journal of Operational Research
Vuosikerta304
Numero3
Varhainen verkossa julkaisun päivämäärä2022
DOI - pysyväislinkit
TilaJulkaistu - 1 helmik. 2023
OKM-julkaisutyyppiA1 Alkuperäisartikkeli tieteellisessä aikakauslehdessä

Sormenjälki