Timescapes of CCS Projects: Is Deferring Projects and Policies Just Kicking the can Down the Road?

Farid Karimi

Tutkimustuotos: Artikkeli kirjassa/konferenssijulkaisussaConference contributionScientificvertaisarvioitu

124 Lataukset (Pure)

Abstrakti

CCS is considered a transition measure to a completely sustainable energy regime. Nonetheless, in recent years, several projects have been cancelled or postponed. This raises some questions about temporal issues.

This study defines temporal features (i.e. frame, timing, tempo, and duration) for policy making and deployment of large-scale CCS projects. According to this study, it appears that CCS deployment is lagging behind due to institutional inertia and poor temporal fit. Thus, unless significant progress is made in a very few years, CCS will lose ground to other alternatives. Timing should be taken into consideration in every matter of CCS.
AlkuperäiskieliEnglanti
Otsikko13th International Conference on Greenhouse Gas Control Technologies, GHGT-13, 14-18 November 2016, Lausanne, Switzerland
KustantajaElsevier
Sivut7317–7325
TilaJulkaistu - 2017
OKM-julkaisutyyppiA4 Artikkeli konferenssijulkaisuussa
TapahtumaInternational Conference on Greenhouse Gas Control Technologies - Lausanne, Sveitsi
Kesto: 14 marraskuuta 201618 marraskuuta 2016
Konferenssinumero: 13

Julkaisusarja

NimiENERGY PROCEDIA
KustantajaElsevier BV
Vuosikerta114
ISSN (painettu)1876-6102

Conference

ConferenceInternational Conference on Greenhouse Gas Control Technologies
LyhennettäGHGT
MaaSveitsi
KaupunkiLausanne
Ajanjakso14/11/201618/11/2016

Sormenjälki

Sukella tutkimusaiheisiin 'Timescapes of CCS Projects: Is Deferring Projects and Policies Just Kicking the can Down the Road?'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.

Siteeraa tätä