TY - JOUR
T1 - The dynamics of repairing multi-project control practice
T2 - a project governance viewpoint
AU - Laine, Teemu
AU - Korhonen, Tuomas
AU - Suomala, Petri
PY - 2020/10
Y1 - 2020/10
N2 - This paper examines the development of enabling control practice, within flexible project governance. Enabling control would interactively help reach the objectives set for multi-project new product development (NPD) management and, especially support the different managerial actors involved. Previous research does not adequately cover the dynamics and interplay between different managerial actors in developing management control for multi-project NPD. This paper responds to the question: How can actors interactively repair multi-project control practice within project governance? The paper takes advantage of a longitudinal action research endeavor (2009-2014), featuring research interventions on developing project control in subsequent NPD projects. The researchers collected empirical data from 130 documented project meetings, workshops, and interactions, and the data were qualitatively analyzed to identify critical steps in multi-project control practice repair. First, as a contribution to the project management literature, we show how the repair effort, as organizational interplay, may effectively, and temporarily or permanently repair inoperative NPD control practice in subsequent projects. Second, we contribute to the literature on enabling control by showing how repairing multi-project control system can be a starting point for centralized control repair, requiring commitment from different management levels. Third, by bridging the two research areas, we identify possibilities for further research.
AB - This paper examines the development of enabling control practice, within flexible project governance. Enabling control would interactively help reach the objectives set for multi-project new product development (NPD) management and, especially support the different managerial actors involved. Previous research does not adequately cover the dynamics and interplay between different managerial actors in developing management control for multi-project NPD. This paper responds to the question: How can actors interactively repair multi-project control practice within project governance? The paper takes advantage of a longitudinal action research endeavor (2009-2014), featuring research interventions on developing project control in subsequent NPD projects. The researchers collected empirical data from 130 documented project meetings, workshops, and interactions, and the data were qualitatively analyzed to identify critical steps in multi-project control practice repair. First, as a contribution to the project management literature, we show how the repair effort, as organizational interplay, may effectively, and temporarily or permanently repair inoperative NPD control practice in subsequent projects. Second, we contribute to the literature on enabling control by showing how repairing multi-project control system can be a starting point for centralized control repair, requiring commitment from different management levels. Third, by bridging the two research areas, we identify possibilities for further research.
KW - Action research
KW - Control
KW - Enabling control
KW - Interventionist research
KW - Management accounting
KW - Multi-project management
KW - New product development
KW - Project governance
KW - Repair
UR - http://www.scopus.com/inward/record.url?scp=85087686683&partnerID=8YFLogxK
U2 - 10.1016/j.ijproman.2020.06.010
DO - 10.1016/j.ijproman.2020.06.010
M3 - Article
AN - SCOPUS:85087686683
VL - 38
SP - 405
EP - 418
JO - International Journal of Project Management
JF - International Journal of Project Management
SN - 0263-7863
IS - 7
ER -