Real-time resource tracking for analyzing value-adding time in construction. / Zhao, Jianyu; Seppänen, Olli; Peltokorpi, Antti; Badihi , Behnam; Olivieri, Hylton.

julkaisussa: Automation in Construction, Vuosikerta 104, 01.08.2019, s. 52-65.

Tutkimustuotos: Lehtiartikkelivertaisarvioitu

Harvard

APA

Vancouver

Author

Bibtex - Lataa

@article{47c6a95fdaa241b083c47f1830b42f84,
title = "Real-time resource tracking for analyzing value-adding time in construction",
abstract = "Improving the effectiveness of production control has attracted the interest of researchers and lean construction practitioners over recent years, through techniques such as Last Planner System (LPS) and Location-based Management System (LBMS). However, in these techniques, data collection and analysis still remain manual. Remotely locating workers on site has been suggested as a potential technology to collect crucial data required for production control. The purpose of this study is to test the applicability of a real-time tracking system for collecting data for production control in different types of construction projects. We applied Bluetooth Low Energy (BLE) technology in real-time tracking of workers in three case projects, including residential, office building, and plumbing renovation. We compared various tracking device placement strategies and analyzed the share of uninterrupted presence of workers in work locations based on the collected data. The findings show that both location-based and time-based information of workers can be obtained in real time from the proposed system, but issues of accuracy and coverage need to be considered when defining the data collection plan for each project. Accuracy and coverage issues can be resolved to a significant degree by applying heuristics in data analysis rather than investing in a more sophisticated tracking technology. The conclusion is that real-time tracking technologies are ready for implementation when certain heuristics and guidelines for installation are followed. It is possible to calculate a real-time presence index on a construction site. These data could be used to evaluate the impact of construction management interventions on waste on-site.",
keywords = "real-time tracking, production control, construction, data analysis, value-adding time",
author = "Jianyu Zhao and Olli Sepp{\"a}nen and Antti Peltokorpi and Behnam Badihi and Hylton Olivieri",
year = "2019",
month = "8",
day = "1",
doi = "10.1016/j.autcon.2019.04.003",
language = "English",
volume = "104",
pages = "52--65",
journal = "Automation in Construction",
issn = "0926-5805",
publisher = "Elsevier",

}

RIS - Lataa

TY - JOUR

T1 - Real-time resource tracking for analyzing value-adding time in construction

AU - Zhao, Jianyu

AU - Seppänen, Olli

AU - Peltokorpi, Antti

AU - Badihi , Behnam

AU - Olivieri, Hylton

PY - 2019/8/1

Y1 - 2019/8/1

N2 - Improving the effectiveness of production control has attracted the interest of researchers and lean construction practitioners over recent years, through techniques such as Last Planner System (LPS) and Location-based Management System (LBMS). However, in these techniques, data collection and analysis still remain manual. Remotely locating workers on site has been suggested as a potential technology to collect crucial data required for production control. The purpose of this study is to test the applicability of a real-time tracking system for collecting data for production control in different types of construction projects. We applied Bluetooth Low Energy (BLE) technology in real-time tracking of workers in three case projects, including residential, office building, and plumbing renovation. We compared various tracking device placement strategies and analyzed the share of uninterrupted presence of workers in work locations based on the collected data. The findings show that both location-based and time-based information of workers can be obtained in real time from the proposed system, but issues of accuracy and coverage need to be considered when defining the data collection plan for each project. Accuracy and coverage issues can be resolved to a significant degree by applying heuristics in data analysis rather than investing in a more sophisticated tracking technology. The conclusion is that real-time tracking technologies are ready for implementation when certain heuristics and guidelines for installation are followed. It is possible to calculate a real-time presence index on a construction site. These data could be used to evaluate the impact of construction management interventions on waste on-site.

AB - Improving the effectiveness of production control has attracted the interest of researchers and lean construction practitioners over recent years, through techniques such as Last Planner System (LPS) and Location-based Management System (LBMS). However, in these techniques, data collection and analysis still remain manual. Remotely locating workers on site has been suggested as a potential technology to collect crucial data required for production control. The purpose of this study is to test the applicability of a real-time tracking system for collecting data for production control in different types of construction projects. We applied Bluetooth Low Energy (BLE) technology in real-time tracking of workers in three case projects, including residential, office building, and plumbing renovation. We compared various tracking device placement strategies and analyzed the share of uninterrupted presence of workers in work locations based on the collected data. The findings show that both location-based and time-based information of workers can be obtained in real time from the proposed system, but issues of accuracy and coverage need to be considered when defining the data collection plan for each project. Accuracy and coverage issues can be resolved to a significant degree by applying heuristics in data analysis rather than investing in a more sophisticated tracking technology. The conclusion is that real-time tracking technologies are ready for implementation when certain heuristics and guidelines for installation are followed. It is possible to calculate a real-time presence index on a construction site. These data could be used to evaluate the impact of construction management interventions on waste on-site.

KW - real-time tracking

KW - production control

KW - construction

KW - data analysis

KW - value-adding time

UR - http://www.scopus.com/inward/record.url?scp=85064459028&partnerID=8YFLogxK

U2 - 10.1016/j.autcon.2019.04.003

DO - 10.1016/j.autcon.2019.04.003

M3 - Article

VL - 104

SP - 52

EP - 65

JO - Automation in Construction

JF - Automation in Construction

SN - 0926-5805

ER -

ID: 33005754