Production control in construction has been mainly discussed within the scope of Lean Construction, through tools and methods such as Last Planner System (LPS), Location-Based Management System (LBMS), and Takt Time Planning (TTP). However, despite the increasing use of these systems, information about the use of equipment, labour, and materials is still gathered through manual data collection, if at all. Real-time process information about these production factors is missing. This paper proposes an intelligent system for real-time production control (iCONS), which has been developed based on the requirements set by construction professionals from four countries, the existing technical solutions that have been used in real-time tracking, and on the proposed new solutions that can fulfill the requirements. Four types of requirements were identified based on interviews: 1) safety management, 2) monitoring process information, productivity and waste, 3) material logistics, and 4) location-based information on pull basis. The proposed system fills the key requirements by sharing and integrating real-time information between materials tracked with RFID tags, labour and equipment tracked by Bluetooth beacons, communicating with location-based gateways and iCONS app through a cloud-based solution. Project teams can use this system to improve production efficiency, management of suppliers, and safety conditions.

AlkuperäiskieliEnglanti
OtsikkoIGLC 2017 - Proceedings of the 25th Annual Conference of the International Group for Lean Construction
KustantajaInternational Group for Lean Construction (IGLC)
Sivut671-678
Sivumäärä8
DOI - pysyväislinkit
TilaJulkaistu - 2017
OKM-julkaisutyyppiA4 Artikkeli konferenssijulkaisussa
TapahtumaANNUAL CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION - Hersonissos, Kreikka
Kesto: 9 heinäk. 201712 heinäk. 2017
Konferenssinumero: 25

Julkaisusarja

NimiAnnual Conference of the International Group for Lean Construction
KustantajaInternational Group for Lean Construction
Numero25
ISSN (painettu)2309-0979

Conference

ConferenceANNUAL CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION
LyhennettäIGLC
Maa/AlueKreikka
KaupunkiHersonissos
Ajanjakso09/07/201712/07/2017

Sormenjälki

Sukella tutkimusaiheisiin 'Real-time tracking of production control : Requirements and solutions'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.

Siteeraa tätä