Modeling Information Flows Between Last Planner and Location Based Management System

  • Webcor Builders

Tutkimustuotos: Artikkeli kirjassa/konferenssijulkaisussaConference article in proceedingsScientificvertaisarvioitu

7 Sitaatiot (Scopus)
458 Lataukset (Pure)

Abstrakti

Production planning and control are two of the most important aspects that contribute towards the successful completion of construction projects. The Last Planner® System (LPS) and Location Based Management System (LBMS) have emerged as two popular methods for production planning and control. Previous research has shown that by combining LPS and LBMS there is an opportunity to improve production tracking, forecasting and control and described the process of how the systems can be combined.
However the research has stopped short of developing specific information flows between the two systems. In particular, the use of LBMS forecasts in LPS lookahead planning and the use of LPS constraints in LBMS forecasting lack specific guidelines. Information can be moved in several different ways and research is needed to make sure that the integration adds value. The goal of this research is to evaluate alternative ways to integrate the information in LBMS and LPS systems. Thought experiments and simple scenarios were used to evaluate the benefits and drawbacks of different approaches. The result is an initial proof of concept that can be implemented manually or automated in LBMS and LPS software applications.
AlkuperäiskieliEnglanti
OtsikkoProceedings of the 24th Annual Confenrence of the International Group for Lean Construction
KustantajaNational Pingtung University of Science and Technology
TilaJulkaistu - 2016
OKM-julkaisutyyppiA4 Artikkeli konferenssijulkaisussa
TapahtumaAnnual Conference of the International Group for Lean Construction - Boston, Yhdysvallat
Kesto: 18 heinäk. 201624 heinäk. 2016
Konferenssinumero: 24
http://iglc2016.com/

Julkaisusarja

NimiProceedings of the Annual Conference of the International Group for Lean Construction
KustantajaInternational Group for Lean Construction
ISSN (painettu)2309-0979

Conference

ConferenceAnnual Conference of the International Group for Lean Construction
LyhennettäIGLC
Maa/AlueYhdysvallat
KaupunkiBoston
Ajanjakso18/07/201624/07/2016
www-osoite

Sormenjälki

Sukella tutkimusaiheisiin 'Modeling Information Flows Between Last Planner and Location Based Management System'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.

Siteeraa tätä