With modern automated welding processes, such as laser-hybrid welding, it is possible to produce high-quality welds with good resistance to fatigue. However, although the overall quality of the weld may be good, the joints can still contain significant geometrical variation and geometrical imperfections at the weld notches. In previous research for thin laser-hybrid welded butt joints, small undercut-type imperfections were observed in both toe and root side. These imperfections are usually short along the weld direction and may not be visible when the geometry of the weld is examined. However, such imperfections work as local stress risers and may influence the fatigue strength significantly based on the weakest link principle. Severity of the local notch geometry is commonly analysed by the two-dimensional analyses, which assumes constant geometry in weld direction. This approach is conservative for short undercuts due to macro-support of the surrounding material. In this study, the difference between two-dimensional and three-dimensional stress analyses for short semi-elliptic undercuts is examined using stress averaging approach. The study utilises parametric notch models, where geometric parameters, such as notch length, depth, radius and opening angle, are varied to examine the difference for different undercut shapes.
Alkuperäiskieli | Englanti |
---|---|
Sivut | 277-291 |
Sivumäärä | 15 |
Julkaisu | Welding in the World |
Vuosikerta | 63 |
Numero | 2 |
DOI - pysyväislinkit | |
Tila | Julkaistu - 8 maalisk. 2019 |
OKM-julkaisutyyppi | A1 Alkuperäisartikkeli tieteellisessä aikakauslehdessä |
Sormenjälki
Sukella tutkimusaiheisiin 'Influence of three-dimensional weld undercut geometry on fatigue-effective stress'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.Projektit
- 1 Päättynyt
-
Korkealaatuisten hitsien väsymislujuusmallinnus huomioiden mikrorakenne
Lehto, P. (Projektin jäsen), Åman, M. (Projektin jäsen), Remes, H. (Vastuullinen tutkija), Sarikka, T. (Projektin jäsen), Gallo, P. (Projektin jäsen) & Malitckii, E. (Projektin jäsen)
01/09/2016 → 31/12/2020
Projekti: Academy of Finland: Other research funding
Laitteet
-
i3 – Industry Innovation Infrastructure
Sainio, P. (Manager)
Insinööritieteiden korkeakouluLaitteistot/tilat: Facility
-
Solid Mechanics Laboratory (i3)
Lehto, P. (Manager)
Energia- ja konetekniikan laitosLaitteistot/tilat: Facility