Improving Life Cycle Management by employing BIM in Real Estate Management – Case Study

Miro Ristimäki, Vishal Singh

    Tutkimustuotos: Artikkeli kirjassa/konferenssijulkaisussaKonferenssiesitysScientific

    Abstrakti

    BIM – Building Information Modelling (and Management) is generally used during the design and construction phase of the buildings life cycle. The applicability and added value of BIM in real estate management (REM) has received little attention and interest from investors and operators – implying the question; how can BIM be better utilized to create value for stakeholders in the maintenance phase and thus improve life cycle management?
    The purpose of this research is to identify opportunities and challenges when employing BIM into REM. In particular this paper aims to identify the benefits of BIM for different stakeholders within REM in order to demonstrate added value and improved life cycle management within the building sector.
    The reported findings are primarily based on a qualitative case study of a hospital PPP-project in the construction phase where BIM has been set high on the agenda. By conducting interviews with different stakeholders the results are analysed using a theoretical lens of technological frames in order to understand the underlying opportunities, challenges and benefits that stakeholders perceive regarding BIM. The results indicate that in this particular case study life cycle management can be improved through employing BIM. The perceived benefits gained through improved information management are related to cost-, time- and resource efficiency in the buildings operational phase.
    There are feasible opportunities to be considered and developed for FM operators and investors now and in the future. Findings suggest that by comprehensively extending and employing BIM into Real Estate Management, more value can be attained from a life cycle perspective.
    AlkuperäiskieliEnglanti
    Sivut1
    Sivumäärä12
    TilaJulkaistu - 13 syyskuuta 2014
    TapahtumaCIB W55/65/89 International Conference on Construction in a Changing World - Heritance Kandalama, Sri Lanka
    Kesto: 4 toukokuuta 20144 toukokuuta 2014

    Conference

    ConferenceCIB W55/65/89 International Conference on Construction in a Changing World
    MaaSri Lanka
    KaupunkiHeritance Kandalama
    Ajanjakso04/05/201404/05/2014

    Sormenjälki Sukella tutkimusaiheisiin 'Improving Life Cycle Management by employing BIM in Real Estate Management – Case Study'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.

  • Siteeraa tätä

    Ristimäki, M., & Singh, V. (2014). Improving Life Cycle Management by employing BIM in Real Estate Management – Case Study. 1. Julkaisun esittämispaikka: CIB W55/65/89 International Conference on Construction in a Changing World, Heritance Kandalama, Sri Lanka.