Implementing Takt Production in Renovation Projects

  • Jenni Sahlberg*
  • , Joonas Lehtovaara
  • , Olli Seppänen
  • *Tämän työn vastaava kirjoittaja
  • YIT Suomi Oy

Tutkimustuotos: Artikkeli kirjassa/konferenssijulkaisussa › Conference article in proceedings › Scientific › vertaisarvioitu

5 Sitaatiot (Scopus)
124 Lataukset (Pure)

Abstrakti

Renovation projects are a special type of construction projects. The unique features of renovation projects make production control challenging, as they often cause a great deal of variation, resulting in waste in production and reducing profitability. Takt production has been applied to renovation, but its specific suitability and benefits in renovation projects have not been studied widely. This paper describes a design science study that i) examines the suitability of takt production in renovation projects through literature and interviews, ii) designs a process model for applying takt production in renovation projects, and iii) applies and validates the designed process model in a case project. The findings imply that takt production can benefit renovation projects. The study highlights the significance of fulfilled prerequisites and well-managed supporting functions in takt production. If these requirements are not fully met, the significance of proactive problem-solving in production control and collaborative practices increases.
AlkuperäiskieliEnglanti
Otsikko29th Annual Conference of the International Group for Lean Construction
JulkaisupaikkaLima, Peru
KustantajaInternational Group for Lean Construction (IGLC)
Sivut677-686
Sivumäärä10
ISBN (elektroninen)9786124802546
DOI - pysyväislinkit
TilaJulkaistu - heinäk. 2021
OKM-julkaisutyyppiA4 Artikkeli konferenssijulkaisussa
TapahtumaAnnual Conference of the International Group for Lean Construction - Lima, Peru
Kesto: 14 heinäk. 2021 → 16 heinäk. 2021
Konferenssinumero: 29

Julkaisusarja

NimiAnnual Conference of the International Group for Lean Construction
KustantajaIGLC.net
ISSN (elektroninen)2309-0979

Conference

ConferenceAnnual Conference of the International Group for Lean Construction
LyhennettäIGLC
Maa/AluePeru
KaupunkiLima
Ajanjakso14/07/2021 → 16/07/2021

Sormenjälki

Sukella tutkimusaiheisiin 'Implementing Takt Production in Renovation Projects'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.

Siteeraa tätä