Impact of voltage and network losses on conductor sizing and topology of MV networks with high penetration of renewable energy resources

John Millar, Eero Saarijärvi, Udo Müller, Stephen Fettke, Marko Filler

Tutkimustuotos: Artikkeli kirjassa/konferenssijulkaisussaConference contributionScientificvertaisarvioitu

37 Lataukset (Pure)

Abstrakti

This paper discusses heuristic distribution company planning rules, which are pragmatic but challenging to implement in a planning algorithm that aims to efficiently produce close to optimum solutions. The main focus is on how voltage is handled, and how other parameters, such as the cost of network losses and the time horizon used for planning, affect voltage. This is illustrated via Greenfield horizon plans and cost breakdowns based on a typical distribution network in the south of Germany.
AlkuperäiskieliEnglanti
OtsikkoProceedings of the 25th International Conference on Electricity Distribution, CIRED 2019
KustantajaInstitution of Engineering and Technology
Sivumäärä5
ISBN (painettu)978-2-9602415-0-1
TilaJulkaistu - kesäk. 2019
OKM-julkaisutyyppiA4 Artikkeli konferenssijulkaisuussa
TapahtumaInternational Conference and Exhibition on Electricity Distribution - Madrid, Espanja
Kesto: 3 kesäk. 20196 kesäk. 2019
Konferenssinumero: 25

Conference

ConferenceInternational Conference and Exhibition on Electricity Distribution
LyhennettäCIRED
Maa/AlueEspanja
KaupunkiMadrid
Ajanjakso03/06/201906/06/2019

Sormenjälki

Sukella tutkimusaiheisiin 'Impact of voltage and network losses on conductor sizing and topology of MV networks with high penetration of renewable energy resources'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.

Siteeraa tätä