GREGOR telescope- Start of commissioning

R. Volkmer*, O. Von Der Lühe, C. Denker, S. Solanki, H. Balthasar, T. Berkefeld, P. Caligari, M. Collados, C. Halbgewachs, F. Heidecke, A. Hofmann, M. Klvana, F. Kneer, A. Lagg, E. Popow, D. Schmidt, W. Schmidt, M. Sobotka, D. Soltau, K. Strassmeier

*Tämän työn vastaava kirjoittaja

Tutkimustuotos: Artikkeli kirjassa/konferenssijulkaisussaConference article in proceedingsScientificvertaisarvioitu

13 Sitaatiot (Scopus)

Abstrakti

With the integration of a 1-meter Cesic primary mirror the GREGOR telescope pre-commissioning started. This is the first time, that the entire light path has seen sunlight. The pre-commissioning period includes testing of the main optics, adaptive optics, cooling system, and pointing system. This time was also used to install a near-infrared grating spectro-polarimeter and a 2D-spectropolarimeter for the visible range as first-light science instruments. As soon as the final 1.5 meter primary mirror is installed, commissioning will be completed, and an extended phase of science verification will follow. In the near future, GREGOR will be equipped with a multi-conjugate adaptive optics system that is presently under development at KIS.

AlkuperäiskieliEnglanti
OtsikkoGround-Based and Airborne Telescopes III
KustantajaSPIE
PainosPART 1
ISBN (painettu)9780819482235
DOI - pysyväislinkit
TilaJulkaistu - 2010
OKM-julkaisutyyppiA4 Artikkeli konferenssijulkaisussa
TapahtumaGround-Based and Airborne Telescopes - San Diego, Yhdysvallat
Kesto: 27 kesäk. 20102 heinäk. 2010
Konferenssinumero: 3

Julkaisusarja

NimiProceedings of SPIE - The International Society for Optical Engineering
NumeroPART 1
Vuosikerta7733
ISSN (painettu)0277-786X

Conference

ConferenceGround-Based and Airborne Telescopes
Maa/AlueYhdysvallat
KaupunkiSan Diego
Ajanjakso27/06/201002/07/2010

Sormenjälki

Sukella tutkimusaiheisiin 'GREGOR telescope- Start of commissioning'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.

Siteeraa tätä