The KanBIM™ system is designed to support lean work flow control on construction sites. It facilitates short-term work planning and monitoring, providing clear visualization of the maturity of tasks planned and the status of work under way. The goal of the KanBIM research is to determine whether a BIM based workflow information system can help construction personnel implement lean pull flow strategies. An early prototype of system, with field reporting interfaces, a central database and a building information model, was implemented and tested on a large residential construction site. Although PPC and other results were measured, the main significance of the results lie in the site personnel's positive experience with the system and their observations of the ways in which it could influence the behaviour and productivity of crews. These included recognition of the strong impact the system had in encouraging well-informed discussion and negotiation between crews concerning coordination of their work. The participants identified specific benefits a full implementation could bring to subcontractor trade managers, superintendents and various project management functions.

AlkuperäiskieliEnglanti
Otsikko19th Annual Conference of the International Group for Lean Construction 2011, IGLC 2011
Sivut465-476
Sivumäärä12
TilaJulkaistu - 1 joulukuuta 2011
OKM-julkaisutyyppiA4 Artikkeli konferenssijulkaisuussa
TapahtumaAnnual Conference of the International Group for Lean Construction - Lima, Peru
Kesto: 13 heinäkuuta 201115 heinäkuuta 2011
Konferenssinumero: 19

Julkaisusarja

Nimi19th Annual Conference of the International Group for Lean Construction 2011, IGLC 2011

Conference

ConferenceAnnual Conference of the International Group for Lean Construction
LyhennettäIGLC
Maa/AluePeru
KaupunkiLima
Ajanjakso13/07/201115/07/2011

Sormenjälki

Sukella tutkimusaiheisiin 'Field tests of the KanBIM™ lean production management system'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.

Siteeraa tätä