Estimate of 3D power wall loads due to Neutral Beam Injection in EU DEMO ramp-up phase

Tutkimustuotos: Lehtiartikkelivertaisarvioitu

Tutkijat

Organisaatiot

  • CNR
  • CEA
  • University of Campania Luigi Vanvitelli

Kuvaus

Heating and current drive systems such as high energy Neutral Beam Injection (NBI) are being considered for pulsed EU DEMO (“DEMO1”) pre-conceptual design. Their aim is to provide auxiliary power, not only during flat-top, but also during transient phases (i.e. plasma current ramp-up and ramp-down). In this work, NBI fast particle power loads on DEMO1 first wall, due to shine-through and orbit losses, are calculated for the diverted plasma ramp-up phase. Numerical simulations are performed using BBNBI and ASCOT Monte Carlo codes. The simulations have been done using a complete 3D wall geometry, and implementing the latest DEMO NBI design, which foresees NBI at 800 keV particle energy. Location and power density of NBI-related power loads at different ramp-up time steps are evaluated and compared with the maximum tolerable heat flux taken from ITER case. Since NBI shine-through losses (dominant during low density phases) depend mainly on the beam energy, plasma density and volume, DEMO has a more favourable situation than ITER, enlarging NBI operational window. Using ITER criteria, DEMO NBI at full energy and power could be switched on during ramp-up at <ne> ~ 1.3 × 1019 m-3. This increases the appeal of neutral beam injectors as auxiliary power systems for DEMO.

Yksityiskohdat

AlkuperäiskieliEnglanti
Sivut188-192
Sivumäärä5
JulkaisuNuclear Materials and Energy
Vuosikerta18
TilaJulkaistu - 1 tammikuuta 2019
OKM-julkaisutyyppiA1 Julkaistu artikkeli, soviteltu

Lataa tilasto

Ei tietoja saatavilla

ID: 31090193