Cost-based unit commitment considering prohibited zones and reserve uncertainty

A. Abdollahi*, M. Ehsan, M. Rashidinejad, M. Pourakbari-Kasmaei

*Tämän työn vastaava kirjoittaja

Tutkimustuotos: LehtiartikkeliArticleScientificvertaisarvioitu

9 Sitaatiot (Scopus)

Abstrakti

Generation scheduling is a crucial challenge in power systems especially under new environment of liberalization of electricity industry. This paper is focused on the economical aspect of UC problem, while the next load demand as a very important issue and prohibited operation zones and spinning reserve uncertainty as practical constraints have been taken in to account. The impacts of hot/cold start-up cost have been considered in this paper. Numerical results show a significant improvement in the solutions of a cost-based unit commitment in comparison with the other studies.

AlkuperäiskieliEnglanti
Sivut425-433
Sivumäärä9
JulkaisuInternational Review of Electrical Engineering
Vuosikerta4
Numero3
TilaJulkaistu - kesäkuuta 2009
OKM-julkaisutyyppiA1 Julkaistu artikkeli, soviteltu

Sormenjälki Sukella tutkimusaiheisiin 'Cost-based unit commitment considering prohibited zones and reserve uncertainty'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.

Siteeraa tätä