Achieving a 4-Hour Takt Time – and Driving Change With It

Jaakko Riekki*, Jukka Rannisto, Joonas Lehtovaara, Olli Seppänen, Antti Peltokorpi

*Tämän työn vastaava kirjoittaja

Tutkimustuotos: Artikkeli kirjassa/konferenssijulkaisussaConference article in proceedingsScientificvertaisarvioitu

61 Lataukset (Pure)

Abstrakti

This study seeks to validate the hypothesis that takt production can be used as a driver for implementing several lean construction concepts together and for making them work as a system. This is done by studying a single case project where takt production with a 4-hour takt time was a core element of the operating system. In studying the case, a set of lean construction concepts found present in the project are extracted and analysed. It is concluded that takt production and in particular the short takt time worked to integrate the stakeholders and enabled the individual lean construction concepts to work in a tight relationship. Future case studies could be more explicitly designed to further validate the hypothesis.
AlkuperäiskieliEnglanti
OtsikkoProceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31)
KustantajaInternational Group for Lean Construction (IGLC)
Sivut1184-1195
Sivumäärä12
DOI - pysyväislinkit
TilaJulkaistu - 31 heinäk. 2023
OKM-julkaisutyyppiA4 Artikkeli konferenssijulkaisussa
TapahtumaAnnual Conference of the International Group for Lean Construction - Lille, Ranska
Kesto: 26 kesäk. 20232 heinäk. 2023
Konferenssinumero: 31

Julkaisusarja

NimiAnnual Conference of the International Group for Lean Construction
ISSN (painettu)2309-0979
ISSN (elektroninen)2789-0015

Conference

ConferenceAnnual Conference of the International Group for Lean Construction
LyhennettäIGLC
Maa/AlueRanska
KaupunkiLille
Ajanjakso26/06/202302/07/2023

Sormenjälki

Sukella tutkimusaiheisiin 'Achieving a 4-Hour Takt Time – and Driving Change With It'. Ne muodostavat yhdessä ainutlaatuisen sormenjäljen.

Siteeraa tätä