Abstrakti
In this paper, the current status of the modeling, simulation and control of the copper leaching, solvent-extraction and electrowinmng process (LX/SX/EW) is reviewed. A prototype of a novel process monitoring system, based on copper solvent extraction steady-state mass balances, is described as the first step of an advanced process control system development. An implementation is also presented. Finally, the off-line testing results obtained with actual plant data are presented and discussed.
Alkuperäiskieli | Englanti |
---|---|
Sivut | 221-226 |
Julkaisu | IFAC PROCEEDINGS VOLUMES |
Vuosikerta | 37 |
Numero | 15 |
DOI - pysyväislinkit | |
Tila | Julkaistu - 2004 |
OKM-julkaisutyyppi | A4 Artikkeli konferenssijulkaisuussa |
Tapahtuma | IFAC Symposium on Automation in Mining, Mineral and Metal Processing - Nancy, Ranska Kesto: 8 syysk. 2004 → 10 syysk. 2004 Konferenssinumero: 11 |
Tutkimusalat
- hydrometallurgy, SX/EW, Process monitoring