Abstract
The “Big Room” in construction refers to a large facility supporting the colocation of the entire project team, where some of the critical problems such as delays in decision-making, problems in communication, disparity in design iterations are eliminated, and trust is increased. However, one of the most demanding aspects of this concept is the almost constant presence of the project participants, which may be difficult for small or medium projects. We therefore propose “Virtual Big Room”, where the concept of collocation of workers will be deployed through virtual technologies. A combination of product and process modelling techniques along with communication and social network tools are proposed to develop the proposed platform that will integrate the entire supply chain through the project lifecycle (i.e. design, construction, handover).
Original language | English |
---|---|
Title of host publication | Proceedings of 8th Nordic Conference on Construction Economics and Organization |
Pages | 586-593 |
DOIs | |
Publication status | Published - 2015 |
MoE publication type | A4 Article in a conference publication |
Event | Nordic Conference on Construction Economics and Organisation - Tampere, Finland Duration: 28 May 2015 → 29 May 2015 Conference number: 8 |
Publication series
Name | Procedia Economics and Finance |
---|---|
Publisher | Elsevier |
Volume | 21 |
ISSN (Print) | 2212-5671 |
Conference
Conference | Nordic Conference on Construction Economics and Organisation |
---|---|
Abbreviated title | CEO |
Country/Territory | Finland |
City | Tampere |
Period | 28/05/2015 → 29/05/2015 |
Keywords
- big room
- BIM
- IPD
- knotworking