T1 - Tunnelling-Induced Settlement and Treatment Techniques for a Loess Metro in Xi’an
AU - Li, Heng
AU - Ma, Enlin
AU - Lai, Jinxing
AU - Wang, Lixin
AU - Xu, Shuoshuo
AU - Wang, Ke
AU - Liu, Tong
A2 - Vieira, Castorina S.
PY - 2020/11/6
Y1 - 2020/11/6
N2 - Techniques including pre-grouting, long pipe roof, and parameter optimization were employed to ensure the safety of loess metro tunnelling under an existing glass building. Their effects were proved through monitoring the settlement of building and surface during tunnelling. Besides, division of settlement monitoring according to processes, a new method, was conducted to control settlement in time. The highest surface settlement after construction was 16 mm only, meeting the requirement. The result indicates that it is practicable to control the tunnelling settlement strictly in extremely difficult geological areas. The settlement regularities were also studied through numerical simulation; their deformation is larger compared with in situ results while their change trends coincide during most processes. Soil excavations cause settlement primarily, accounting for more than 60%. It is suggested that dual slurry pre-grouting and process-based measurement should be employed before each excavation in water-rich loess areas.1. Introduction
AB - Techniques including pre-grouting, long pipe roof, and parameter optimization were employed to ensure the safety of loess metro tunnelling under an existing glass building. Their effects were proved through monitoring the settlement of building and surface during tunnelling. Besides, division of settlement monitoring according to processes, a new method, was conducted to control settlement in time. The highest surface settlement after construction was 16 mm only, meeting the requirement. The result indicates that it is practicable to control the tunnelling settlement strictly in extremely difficult geological areas. The settlement regularities were also studied through numerical simulation; their deformation is larger compared with in situ results while their change trends coincide during most processes. Soil excavations cause settlement primarily, accounting for more than 60%. It is suggested that dual slurry pre-grouting and process-based measurement should be employed before each excavation in water-rich loess areas.1. Introduction
UR - https://doi.org/10.1155/2020/1854813
U2 - 10.1155/2020/1854813
DO - 10.1155/2020/1854813
M3 - Article
SN - 1687-8086
JO - Advances in Civil Engineering
JF - Advances in Civil Engineering
M1 - 1854813
ER -