Abstract
Takt time planning has recently received a lot of attention in lean construction community. However, very few empirical results have been reported. This paper presents a takt time planning case study from a closely related industry, cruise ship cabin refurbishment. The results of lean implementation in the case company have been very good, including productivity increase to 380% of baseline, WIP decrease of 99%, quality defect decrease of 99% and project lead time reduction of 73%. The paper reviews the process used and compares and contrasts the takt time method implemented by case company and the process proposed for construction in previous lean construction conferences. The implemented takt time method was found to be similar to the method proposed in previous lean construction conferences but it includes several additional process steps such as explicitly considering material logistics and garbage collection and real-time data collection. The main differences between project types are in logistics setup and business drivers impacting desire to cut lead time over improving resource efficiency. Interestingly, cycle time reduction achieved both goals in the case company. The contribution of this paper is to show the benefits of takt time planning and to propose additional components to takt time planning process
| Original language | English |
|---|---|
| Title of host publication | Proceedings of the 24th Annual Confenrence of the International Group for Lean Construction |
| Publisher | National Pingtung University of Science and Technology |
| Publication status | Published - 2016 |
| MoE publication type | A4 Conference publication |
| Event | Annual Conference of the International Group for Lean Construction - Boston, United States Duration: 18 Jul 2016 → 24 Jul 2016 Conference number: 24 http://iglc2016.com/ |
Publication series
| Name | Proceedings of the Annual Conference of the International Group for Lean Construction |
|---|---|
| Publisher | International Group for Lean Construction |
| ISSN (Electronic) | 2309-0979 |
Conference
| Conference | Annual Conference of the International Group for Lean Construction |
|---|---|
| Abbreviated title | IGLC |
| Country/Territory | United States |
| City | Boston |
| Period | 18/07/2016 → 24/07/2016 |
| Internet address |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 8 Decent Work and Economic Growth
-
SDG 12 Responsible Consumption and Production
Keywords
- Takt time planning
- Logistics
- Flow
- work in progress
Fingerprint
Dive into the research topics of 'Takt Time Planning: Lessons for Construction Industry from a Cruise Ship Cabin Refurbishment Case Study'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver