Reducing Lead time for electrical switchgear

Jan Elfving, I.D. Tommelein, G. Ballard

    Research output: Chapter in Book/Report/Conference proceedingConference contributionScientificpeer-review

    Original languageEnglish
    Title of host publication10th Annual Conference of International Group of Lean Construction, Gramado, Brasilia, 5.-8-8-2002
    Place of PublicationGramado, Brasilia
    Pages269-282
    Publication statusPublished - 2002
    MoE publication typeA4 Article in a conference publication

    Keywords

    • engineede-to-order product
    • lean construction
    • lend time reduction