Abstract
Currently, the flue gas heat recovery rate is very low in China. But flue gas can contain a large amount of waste heat according to the heat balance of the boiler. In the meantime, flue gas heat loss also dominates different kinds of heat losses for a boiler. Therefore, it is necessary to reduce the flue gas temperature and recover sensible and latent heat for district heating purpose. This paper discusses the application mode of a flue gas scrubber for a combined heat and power (CHP) plant, calculate the flue gas recovery rate using absorption heat pumps and analyse the feasibility for a real case study in China. The results show that the maximum heat recovery rate is about 8% if the flue gas can be cooled down to 30°C, and the payback time for the flue gas scrubber is around 5 years.
Original language | English |
---|---|
Title of host publication | Proceedings Roomvent & Ventilation 2018 |
Publisher | SIY Sisäilmatieto Oy |
Number of pages | 6 |
ISBN (Electronic) | 978-952-5236-48-4 |
Publication status | Published - 2018 |
MoE publication type | A4 Conference publication |
Event | Roomvent & Ventilation Conference - Espoo, Finland Duration: 2 Jun 2018 → 5 Jun 2018 |
Conference
Conference | Roomvent & Ventilation Conference |
---|---|
Country/Territory | Finland |
City | Espoo |
Period | 02/06/2018 → 05/06/2018 |
Keywords
- waste heat
- heat recovery
- scrubber
- combined heat and power (CHP)
- district heating