Abstract

Production control in construction has been mainly discussed within the scope of Lean Construction, through tools and methods such as Last Planner System (LPS), Location-Based Management System (LBMS), and Takt Time Planning (TTP). However, despite the increasing use of these systems, information about the use of equipment, labour, and materials is still gathered through manual data collection, if at all. Real-time process information about these production factors is missing. This paper proposes an intelligent system for real-time production control (iCONS), which has been developed based on the requirements set by construction professionals from four countries, the existing technical solutions that have been used in real-time tracking, and on the proposed new solutions that can fulfill the requirements. Four types of requirements were identified based on interviews: 1) safety management, 2) monitoring process information, productivity and waste, 3) material logistics, and 4) location-based information on pull basis. The proposed system fills the key requirements by sharing and integrating real-time information between materials tracked with RFID tags, labour and equipment tracked by Bluetooth beacons, communicating with location-based gateways and iCONS app through a cloud-based solution. Project teams can use this system to improve production efficiency, management of suppliers, and safety conditions.

Original languageEnglish
Title of host publicationIGLC 2017 - Proceedings of the 25th Annual Conference of the International Group for Lean Construction
PublisherInternational Group for Lean Construction (IGLC)
Pages671-678
Number of pages8
DOIs
Publication statusPublished - 2017
MoE publication typeA4 Conference publication
EventAnnual Conference of the International Group for Lean Construction - Hersonissos, Greece
Duration: 9 Jul 201712 Jul 2017
Conference number: 25

Publication series

NameAnnual Conference of the International Group for Lean Construction
PublisherInternational Group for Lean Construction
Number25
ISSN (Print)2309-0979

Conference

ConferenceAnnual Conference of the International Group for Lean Construction
Abbreviated titleIGLC
Country/TerritoryGreece
CityHersonissos
Period09/07/201712/07/2017

Keywords

  • Communication systems
  • Lean Construction
  • Production control
  • Resources
  • Tracking

Fingerprint

Dive into the research topics of 'Real-time tracking of production control : Requirements and solutions'. Together they form a unique fingerprint.

Cite this