Abstract
The goal of production control is to achieve the goals defined during the planning phase and bring order to construction sites, which are often known for their complex nature. Collaborative methods such as Last Planner System (LPS) and Location-Based Management System (LBMS) have been implemented to improve the production control. However, parties are entering the collaborative planning process with incomplete and outdated information, usually obtained via manual data collection. There is a need of real-time tracking of labor, equipment and materials, in order to improve the production control processes and increase productivity. This research introduces a real-time tracking system to monitor resources and onsite activities in construction projects. Real- time data were collected from construction projects and analysed for different use cases from production control perspective. This paper presents how real-time tracking system can be implemented in different construction projects to improve production control. In future research, data analysis can be automated and an intelligent system which manages resource flows following lean principles can be implemented.
Original language | English |
---|---|
Title of host publication | 17th International Conference on Computing in Civil and Building Engineering |
Place of Publication | Tampere, Finland |
Publisher | Suomen rakennusinsinöörien liitto RIL |
Pages | 449-456 |
ISBN (Print) | 978-951-758-632-0 |
Publication status | Published - 2018 |
MoE publication type | A4 Article in a conference publication |
Event | International Conference on Computing in Civil and Building Engineering - Tampere Hall, Tampere, Finland Duration: 5 Jun 2018 → 7 Jun 2018 Conference number: 17 http://www.ril.fi/en/events/icccbe-2018.html http://www.ril.fi/en/events/icccbe-2018.html |
Conference
Conference | International Conference on Computing in Civil and Building Engineering |
---|---|
Abbreviated title | ICCCBE |
Country | Finland |
City | Tampere |
Period | 05/06/2018 → 07/06/2018 |
Internet address |
Keywords
- real-time tracking
- production control
- construction
- implementation