Planning and Scheduling as a Part of a Control System - Implementation Aspects

Iiro Harjunkoski*

*Corresponding author for this work

Research output: Contribution to journalArticleScientificpeer-review

3 Citations (Scopus)

Abstract

This paper discusses some aspects that need to be taken into account when designing and implementing solutions for scheduling real industrial production processes. It highlights certain characteristics that may complicate the practical implementation and focuses on typical requirements stemming from everyday life at a production facility. The paper concludes with some necessary system development steps and reflects those using experiences from a few real-life implementation cases.

Original languageEnglish
Pages (from-to)1110-1114
Number of pages5
JournalComputer Aided Chemical Engineering
Volume31
DOIs
Publication statusPublished - 2012
MoE publication typeA1 Journal article-refereed

Keywords

  • Control system
  • Industrial
  • Integration
  • Scheduling

Fingerprint Dive into the research topics of 'Planning and Scheduling as a Part of a Control System - Implementation Aspects'. Together they form a unique fingerprint.

  • Cite this