Learning From Delays in Daily Design Work – Comparison of Root Cause Analysis and Functional Resonance Analysis

Research output: Chapter in Book/Report/Conference proceedingConference article in proceedingsScientificpeer-review

62 Downloads (Pure)

Abstract

Procurement and construction work depend on error-free and on-time designs. However, the design process may be erroneous and behind schedule, which often causes cascading delays and problems in the construction process. Hence, when a major delay occurs, practitioners often query the design process, and much time and many resources may be required to find the root cause. However, minor delays and mistakes that occur in everyday work are not usually investigated, even though they can contain information necessary to avoid significant adverse events. This study aimed to determine how three deviations that occurred in a normal, well-progressing project can be investigated using two different methods, as well as the significance of small errors and events in preventing larger errors and events in the future. Root cause analysis and functional resonance analysis were the research methods. The findings of this study showed that slight variability in trivial design and design management tasks generated a considerable number of unnecessary tasks and delays. Therefore, examining variability in the outputs of tasks could benefit designers and design management.
Original languageEnglish
Title of host publicationProceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31)
PublisherInternational Group for Lean Construction (IGLC)
Number of pages12
DOIs
Publication statusPublished - 2023
MoE publication typeA4 Conference publication
EventAnnual Conference of the International Group for Lean Construction - Lille, France
Duration: 26 Jun 20232 Jul 2023
Conference number: 31

Publication series

NameAnnual Conference of the International Group for Lean Construction
ISSN (Print)2309-0979
ISSN (Electronic)2789-0015

Conference

ConferenceAnnual Conference of the International Group for Lean Construction
Abbreviated titleIGLC
Country/TerritoryFrance
CityLille
Period26/06/202302/07/2023

Keywords

  • design
  • root cause analysis
  • Ishikawa diagram
  • functional resonance analysis
  • FRAM
  • RCA

Fingerprint

Dive into the research topics of 'Learning From Delays in Daily Design Work – Comparison of Root Cause Analysis and Functional Resonance Analysis'. Together they form a unique fingerprint.

Cite this