Abstract
A scheduling optimization solution is in many ways still a complex and "exotic" function that seldomly finds its way into the daily practice of the industrial plant floor. Scheduling is too often seen as something decoupled and theoretical that requires highlevel experts for using and maintaining it. In this paper we discuss some of the hurdles for deploying scheduling solutions. Some needs for improvements are identified both in academia and industry and by addressing the main pain points it can be seen that with a common mindset the complexity of scheduling can be lowered significantly.
| Original language | English |
|---|---|
| Pages (from-to) | 63-70 |
| Number of pages | 8 |
| Journal | Computer Aided Chemical Engineering |
| Volume | 37 |
| DOIs | |
| Publication status | Published - 2015 |
| MoE publication type | A1 Journal article-refereed |
Keywords
- Communication
- Integration
- ISA-95
- Scheduling deployment
Fingerprint
Dive into the research topics of 'Industrial perspectives on the deployment of scheduling solutions'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver