Impacts of an assembly kit logistic solution in renovation projects: a multiple case study with camera-based measurement

Research output: Chapter in Book/Report/Conference proceedingConference article in proceedingsProfessional

Abstract

Logistics solutions are crucial for efficiency, especially in renovation projects with tight schedule. Manufacturing industries use kitting of assembly parts to improve time efficiency in assembly. Even if it is a promising solution in renovation projects, there is no empirical research on its impacts in renovation. We examine whether apartment-based assembly kits improve renovation projects’ workflow. A multiple case-study design compares two projects: with and without the solution. Two cameras collected data for performance measurement in the selected apartments. The study generates insights on how kits prepared by a logistic provider in consolidation center can improve on-site performance.
Original languageEnglish
Title of host publicationEurOMA proceedings
PublisherEuropean Operations Management Association (EurOMA)
Publication statusPublished - 24 Jun 2018
MoE publication typeD3 Professional conference proceedings
EventInternational Annual European Operations Management Association Conference - Budapest, Hungary
Duration: 24 Jun 201826 Jun 2018
Conference number: 25
http://euroma2018.org/

Conference

ConferenceInternational Annual European Operations Management Association Conference
Abbreviated titleEurOMA
Country/TerritoryHungary
CityBudapest
Period24/06/201826/06/2018
Internet address

Keywords

  • Construction logistics
  • Kitting
  • Camera-based measurement

Fingerprint

Dive into the research topics of 'Impacts of an assembly kit logistic solution in renovation projects: a multiple case study with camera-based measurement'. Together they form a unique fingerprint.

Cite this