Abstract
This paper discusses heuristic distribution company planning rules, which are pragmatic but challenging to implement in a planning algorithm that aims to efficiently produce close to optimum solutions. The main focus is on how voltage is handled, and how other parameters, such as the cost of network losses and the time horizon used for planning, affect voltage. This is illustrated via Greenfield horizon plans and cost breakdowns based on a typical distribution network in the south of Germany.
Original language | English |
---|---|
Title of host publication | Proceedings of the 25th International Conference on Electricity Distribution, CIRED 2019 |
Publisher | Institution of Engineering and Technology |
Number of pages | 5 |
ISBN (Print) | 978-2-9602415-0-1 |
Publication status | Published - Jun 2019 |
MoE publication type | A4 Conference publication |
Event | International Conference and Exhibition on Electricity Distribution - Madrid, Spain Duration: 3 Jun 2019 → 6 Jun 2019 Conference number: 25 |
Conference
Conference | International Conference and Exhibition on Electricity Distribution |
---|---|
Abbreviated title | CIRED |
Country/Territory | Spain |
City | Madrid |
Period | 03/06/2019 → 06/06/2019 |