title = "If CPM is so bad, why have we been using it so long?",
keywords = "construction management, control, CPM, critical path method, production planning, construction management, control, CPM, critical path method, production planning, construction management, control, CPM, critical path method, production planning",
author = "Lauri Koskela and G. Howell and Ergo Pikas and Bhargav Dave",
note = "VK: BIM",
year = "2014",
language = "English",
pages = "27--37",
editor = "B.T. Kalsaas and Lauri Koskela",
booktitle = "Understanding and Improving Project Based Production: 22nd Annual Conference of the International Group for Lean Construction, Oslo, Norway, 25-27 July 201422nd Annual Conference of the International",