Abstract
The use of hybrid heating systems and energy recycling systems based on several heat sources has grown rapidly. Those hybrid systems implemented are complex, and it has often been noticed that there are often faults in the operation. To guarantee the performance designed, the commission process over the life-cycle needs to be conducted by an experienced engineer.
Original language | English |
---|---|
Pages (from-to) | 61-64 |
Number of pages | 4 |
Journal | Rehva journal |
Volume | 61 |
Issue number | 1 |
Publication status | Published - 2024 |
MoE publication type | D1 Article in a trade journal |
Keywords
- heat pump
- hybrid heating system
- district heating
- HVAC commissioning process