Automation in Construction

Research outputs

  1. 2019
  2. Published

    The effects of control methods on energy efficiency and position tracking of an electro-hydraulic excavator equipped with zonal hydraulics

    Zhang, S., Minav, T., Pietola, M., Kauranne, H. & Kajaste, J., 1 Apr 2019, In : Automation in Construction. 100, p. 129-144 16 p.

    Research output: Contribution to journalArticleScientificpeer-review

  3. 2018
  4. Published

    A framework for integrating BIM and IoT through open standards

    Dave, B., Buda, A., Nurminen, A. & Främling, K., 1 Nov 2018, In : Automation in Construction. 95, p. 35-45 11 p.

    Research output: Contribution to journalArticleScientificpeer-review

  5. 2017
  6. Published

    Lower bounds for as-built deviations against as-designed 3-D Building Information Model from single spherical panoramic image

    Jokinen, O. & Kauhanen, H., 1 Dec 2017, In : Automation in Construction. 84, p. 274-291 18 p.

    Research output: Contribution to journalArticleScientificpeer-review

  7. Published

    Machine learning for durability and service-life assessment of reinforced concrete structures: Recent advances and future directions

    Taffese, W. Z. & Sistonen, E., 2017, In : Automation in Construction. 77, p. 1-14

    Research output: Contribution to journalArticleScientificpeer-review

  8. 2016
  9. Published

    Opportunities for enhanced lean construction management using Internet of Things standards

    Dave, B., Kubler, S., Främling, K. & Koskela, L., Jan 2016, In : Automation in Construction. 61, p. 86-97 12 p.

    Research output: Contribution to journalArticleScientificpeer-review

  10. 2015
  11. Published

    Editorial: Linked Data in Architecture and Construction

    Pauwels, P., Törmä, S., Beetz, J., Weise, M. & Liebich, T., 2015, In : Automation in Construction. 57, p. 175

    Research output: Contribution to journalArticleScientificpeer-review

  12. Published
  13. Published

    Patterns and trends in Building Information Modeling (BIM) research: A Latent Semantic Analysis

    Yalcinkaya, M. & Singh, V., 2015, In : Automation in Construction. 59, p. 68-80

    Research output: Contribution to journalArticleScientificpeer-review

  14. Published

    RDF-based signature algorithms for computing di?erences of IFC models

    Oraskari, J. & Törmä, S., 2015, In : Automation in Construction. 57, p. 213-221

    Research output: Contribution to journalArticleScientificpeer-review

  15. 2014
  16. Published

    2eA-FB: a semantic agent approach to IEC 61499 function blocks in energy efficient building automation systems

    Mousavi, A. & Vyatkin, V., 2014, In : Automation in Construction. 999

    Research output: Contribution to journalArticleScientificpeer-review

  17. 2013
  18. Published

    Feasibility study of fuel cell-hybrid powertrains in non-road mobile machineries

    Liukkonen, M., Lajunen, A. & Suomela, J., 2013, In : Automation in Construction. 35, 1, p. 296-305

    Research output: Contribution to journalArticleScientificpeer-review

  19. Published

    Job Planning and Supervisory Control for Automated Earthmoving using 3D Graphical Tools

    Halbach, E. & Halme, A., 2013, In : Automation in Construction. 32, 7, p. 145-160

    Research output: Contribution to journalArticleScientificpeer-review

  20. Published

    RFID tracking implementation model for the technical trade and construction supply chains

    Hinkka, V. & Tätilä, J., 2013, In : Automation in Construction. 35, 1, p. 405-414

    Research output: Contribution to journalArticleScientificpeer-review

  21. 2011
  22. Published

    A theoretical framework of a BIM-based multi-disciplinary collaboration platform

    Singh, V., Gu, N. & Wang, X., Mar 2011, In : Automation in Construction. 20, 2, p. 134-144 11 p.

    Research output: Contribution to journalArticleScientificpeer-review

  23. 2010
  24. Published

    Integration of chaos theory and mathematical models in building simulation.Part II: Conceptual frameworks

    Lu, X., Clements-Croome, D. & Viljanen, M., 2010, In : Automation in Construction. 19, 4, p. 447-451

    Research output: Contribution to journalArticleScientificpeer-review

  25. Published

    Integration of chaos theory and mathematical models in building simulation.Part I: literature review

    Lu, X., Clements-Croome, D. & Viljanen, M., 2010, In : Automation in Construction. 19, 4, p. 447-451

    Research output: Contribution to journalReview ArticleScientificpeer-review

  26. 2009
  27. Published

    Collaborative knowledge management-A construction case study

    Dave, B. & Koskela, L., Nov 2009, In : Automation in Construction. 18, 7, p. 894-902 9 p.

    Research output: Contribution to journalArticleScientificpeer-review

  28. 2004
  29. Published

    Selection of renovation actions using multi-criteria "knapsack" model

    Alanne, K., 2004, In : Automation in Construction. 13, 3, p. 377-390

    Research output: Contribution to journalArticleScientificpeer-review

  30. 1994
  31. Published

    Design intelligence: Evolutionary and cognitive aspects

    Oksala, T., 1994, In : Automation in Construction. 3, p. 105-111

    Research output: Contribution to journalArticleScientificpeer-review

ID: 187536